Supply & delivery
Supply coordination from inquiry to on-site delivery. We work with qualified manufacturing partners, confirm specifications before production, arrange inspection per order scope, and support component lists, batch records and product labels.
Supply process
- 01
Inquiry
Use, quantity, timeline
- 02
Spec confirm
BOQ, drawings, core & voltage
- 03
Production
After drawing sign-off / deposit
- 04
Inspection
Photos / report per order scope
- 05
Deliver & document
Component list, batch photos, docs
Buyer responsibilities (typical)
- —Foundations, levelling and anchor bolts per signed layout
- —Cranage, rigging and on-site assembly labour (or nominated installer)
- —MEP connections beyond unit interface: mains water, sewer, power incomer
- —Customs clearance, duties and inland haulage at destination
OEM & customization scope
- —Bay size, storeys and module mix per camp layout
- —Wall core material and thickness (EPS / rockwool / PU)
- —Voltage, socket types and basic interior level
- —Bilingual labels, nameplates and product marking