Construction Site Camp

Temporary modular camps for infrastructure and building projects — dormitories, canteen, offices and sanitary blocks for 50–500 workers.

Construction Site Camp

Overview

Construction site camps provide temporary accommodation, dining, offices and support facilities for main civil works. Procurement is typically led by the main contractor or project department, with focus on move-in phasing, site safety and delivery sequencing.

Compared with mining or oil & gas camps, construction camps are shorter-cycle, lower HSE documentation load, and often relocate within the same region after project completion.

Typical project profile

DimensionTypical range
Headcount50–500
Site area0.5–3 ha (incl. roads & laydown)
Duration6 months–3 years
RelocationLow–medium; same-city move or dismantle
RegulationsDestination building, fire and labour housing rules

Recommended building systems

FunctionSystemNotes
Worker dormitories (strip layout)P1Single storey; linked box rows
Site / supervision officeP1 or P4Small offices may use P1 quick-assembly units
Canteen / kitchenP1Linked boxes; rockwool where fire separation required
Central sanitaryP1Separate block from dormitories
Guard houseP1 / P2Fast-deploy entry control
StorageP1 M-STRTools and site materials

Configuration tiers

Three reference BOQ tiers below illustrate module counts and configuration. Final quantities per signed camp layout and delivery list.

Tier A · 80 workers

ModuleQuantitySystemNotes
M-DORM4 × 20 bedsP1Single-storey strips
M-OFF1 × 60 m²P1/P4Meeting + office
M-CANT1 × 80 m²P1Single shift dining
M-SAN1 × 40 m²P1Central sanitary
M-GUA1P1—
M-STR1 × 60 m²P1Tool store

Tier B · 200 workers

ModuleQuantitySystemNotes
M-DORM10 × 20 bedsP1Single-storey linked rows
M-OFF2 × 72 m²P1Main contractor + subcontractor
M-CANT1 × 120 m²P1Two-shift staggered dining
M-SAN2 × 48 m²P1Male / female separated
M-GUA1P1—
M-STR1P1—

Tier C · 400 workers

ModuleQuantitySystemNotes
M-DORMExtended row count vs Tier BP1Single-storey linked zones
M-OFF2–3 × 72 m²P1—
M-CANT1 × 150–180 m²P1Expanded kitchen / storage
M-SAN3 × 48 m²P1~150–200 per sanitary group
M-LAU1 (optional)P1—
M-CLN1 (optional)P1—
M-GUA + M-STR1 eachP1/P4—

Site layout & camp planning

  • —Separate living, office, logistics (kitchen/storage) and shared sanitary zones; kitchen downwind of dormitories.
  • —Fire separation between dormitories and kitchen/generator per project Fire plan.
  • —Central sanitary: dormitory walk ≤50 m; or unit-internal sanitary (more units).
  • —Linked dorm rows: external escape stairs and fire lanes per signed drawings.
  • —Reserve strip-end splice points and utility interfaces for expansion.

Technical & HSE requirements

TopicTypical approach
Wall coreEPS 50–75 mm general; rockwool 75 mm near kitchen/dorm interfaces when required
Electrical220 V / 50 Hz to module interface; buyer provides main supply
Sanitary dischargeModules drain to buyer septic tank / treatment
FoundationStrip footings, leveling — buyer responsibility; supplier provides anchor drawings

Phasing & delivery

For Tier B–C camps, 2–3 delivery batches are typical: Batch 1 — office + sanitary + partial dorm; Batch 2 — main dorm strips; Batch 3 — canteen and storage.

Scale (beds)Production ref. after layout sign-offBatches
50–10025–40 days1–2
100–30035–55 days2–3
300–60045–70 days3–4

Installation & handover

PhaseDuration (ref.)Responsibility
Foundation7–14 daysBuyer
First batch on site—Supplier
First install (office + sanitary + partial dorm)5–10 daysBuyer crew / supplier guidance
Full occupancy10–20 days after first batch—

Request specification

  • —Peak headcount / bed count
  • —Project duration (months)
  • —Site location & climate (coastal / cold zone)
  • —Single-storey layout preference
  • —Sanitary: centralised or in-unit
  • —Canteen shifts (single / double)
  • —Required move-in date for first batch
  • —Existing layout drawings (if any)

Typical specifications for reference only. Final dimensions, materials and quantities per signed drawings and order.