Skip to content
UnitMod
Modular building supply

Prefab & modular buildings for global projects

Spec by drawing, build on site. Relocatable panel systems, light-steel villas and glass sunrooms for construction, mining, energy and residential projects.

Solutions by sector

Solutions by sector

All solutions →
S1 · Construction

Construction Site Camp

Temporary modular camps for infrastructure and building projects — dormitories, canteen, offices and sanitary blocks for 50–500 workers.

S2 · Mining

Mining Camp

Long-duration remote camps for open-pit and underground mining — rockwool envelope, clinic, laundry and expansion-ready dormitory strips for 150–800 workers.

S3 · Oil

Oil & Gas Camp

Rotational workforce camps for oilfield, pipeline and turnaround projects — worker/management zoning, HSE documentation and phased occupancy for 200–1000+ personnel.

S4 · Energy

Energy & Renewable Camp

Wind, solar, BESS and transmission line site camps for 80–250 workers — P4 welded relocatable offices plus P1 dormitory boxes, optimised for multi-site reuse.

S5 · School

School & Clinic

Temporary classrooms, admin blocks and clinic modules for transitional campuses and remote health posts — sized by room count, not bed count alone.

S6 · Emergency

Emergency & Relief

Rapid-deployment shelter for disaster and displacement response — P2 folding and P1 quick-assembly priority, phased WASH and command modules within weeks.

S7 · Residential

Residential & self-build housing

Permanent dwellings for private plots and phased communities — light steel structure, either designed for the plot or a repeatable standard series, with glass garden rooms available as a package.

S8 · Hospitality

Hospitality & resort

Resort rooms, homestay clusters and glazed public buildings — repeatable guest units with reception, restaurant or viewing halls, supplied in phases to match an opening programme.

S9 · Garden

Garden & outdoor living

Glazed outdoor rooms for plots that already have a dwelling — sunrooms, verandas, pool enclosures, rooftop rooms and winter gardens, supplied as a structure you walk into rather than a product you assemble.

Supply process

From inquiry to on-site delivery

Specifications confirmed before production. Each batch is released against a signed drawing set and an agreed component list.

Supply & Delivery →
01

Inquiry

Use, quantity, timeline

02

Spec confirm

BOQ, drawings, core & voltage

03

Production

After drawing sign-off / deposit

04

Inspection

Photos / report per order scope

05

Deliver & document

Component list, batch photos, docs

Why UnitMod

Verifiable project support

  • —Specifications confirmed via signed drawings before production
  • —Component list and batch release coordination per order
  • —Lead time ranges stated per product/system (estimates until BOQ lock)
  • —OEM: bay size, core material, voltage, product labels
  • —Inspection photo/report coordination per order scope
  • —Export documentation support (invoice, customs data — per contract)
Certifications

Compliance documents

In-date PDFs on request — specimens marked until replaced.

View certifications →

Request a quote

No drawings yet? State the use and quantity — we can propose a configuration and a component list for your review.

Get Quote