PRJ-02 · Central Asia
Central Asia Mining Camp
Long-duration open-pit mining camp — ~380 beds with rockwool 100 mm envelope, clinic, laundry and recreation, delivered in 4 batches including Year-2 expansion.

Project summaries illustrate typical export scope and configuration. Client names, exact locations, and figures may be rounded or withheld for confidentiality. Signed BOQ and contract govern actual supply.
Project overview
Long-term camp for an open-pit mining operation including worker dormitories, management offices, canteen, clinic, laundry and recreation. Remote site with large temperature swings and high dust — envelope and sealing per HSE discussions.
Client: Confidential. Duration ~4 years including expansion. Shifts: 12 h × 2.
Scope & scale
| Metric | Value |
|---|---|
| Beds | ~380 (incl. ~40 mgmt/technical singles/doubles) |
| Delivery batches | 4 (incl. one expansion) |
| Shifts | 12 h × 2 |
Configuration summary
| Module | Quantity | System | Notes |
|---|---|---|---|
| M-DORM | ~340 bed worker zone | P1 | — |
| M-DORM | ~40 bed management zone | P1 | — |
| M-OFF | 100 m² | P4 | — |
| M-CANT | 150 m² | P1 | — |
| M-SAN | 3 groups | P1 | — |
| M-CLN | 50 m² | P1 | — |
| M-LAU | 1 × 40 m² | P1 | — |
| M-REC | 1 × 72 m² | P1 | — |
| M-STR | 80 m² | P1 | — |
Building systems & materials
- —P4 welded management office; P1 dormitory, dining and welfare boxes.
- —Rockwool 100 mm walls; enhanced insulation in management zone.
- —Clinic includes observation bed; medical gases not in structural scope.
- —Water: buyer borehole + storage; modules with hot-water interfaces.
Site & phasing
- —Phase 1–3: first 200 beds → main body → clinic/laundry.
- —Phase 4 (Year 2): +80 bed dormitory strip expansion.
- —Four delivery batches to avoid laydown congestion.
Schedule
Year 1: Phases 1–3 occupancy milestones. Year 2: expansion batch aligned with mine production ramp-up.
Constraints & approach
- —Dust: improved door/window sealing; HVAC filtration under buyer MEP package.
- —Expansion: master plan reserved one dorm strip splice and utility interfaces.
- —Long cycle: spare-parts list delivered for camp operator stocking.
Gallery