PRJ-06 · East Africa

East Africa Emergency Shelter Phase 1

Phase 1 humanitarian shelter — ~300 beds via P2/P1 fast-deploy units with mobile sanitary and P3 command/clinic; 2-week deployment target.

East Africa Emergency Shelter Phase 1

Project summaries illustrate typical export scope and configuration. Client names, exact locations, and figures may be rounded or withheld for confidentiality. Signed BOQ and contract govern actual supply.

Project overview

Phase-1 humanitarian shelter package for ~300 people in East Africa, combining P2 folding and P1 quick-assembly accommodation with mobile sanitary groups and P3 command / clinic points.

The deployment target was two weeks from site access. WASH, command and the first shelter zone were prioritised before the remaining accommodation.

Scope & scale

MetricValue
Beds~300
Deployment target2 weeks from site access
SystemsP2 / P1 shelter; P3 command and clinic
ServicesMobile sanitary / minimum WASH

Configuration summary

ModuleQuantitySystemNotes
SHELTER~180 bedsP2Rapid family / small-room units
SHELTER~120 bedsP1Standard multi-bed rooms
M-SANMobile groups sized for Phase 1P1WASH priority
M-OFF2 command unitsP3Registration + coordination
M-CLN1 primary-care pointP3Triage / first aid
M-STR2 distribution storesP1—

Building systems & materials

  • —P2 folding units prioritised for first occupancy; P1 quick-assembly kits increased bulk bed and sanitary capacity.
  • —P3 expandable units provided larger command and clinical floor areas after rapid deployment.
  • —Adjustable supports used only after bearing-surface and temporary wind checks.

Site & phasing

Module IDs on the delivery list matched shelter zones so mixed batches could be directed without resorting.

WavePriority contentOperational result
1Sanitary + command + first P2 shelterRegistration, WASH and first occupancy
2Remaining P2/P1 shelterReach ~300-bed capacity
3Clinic + stores + service completionComplete Phase-1 operations

Schedule

  • —Days 1–3: access, bearing surface, drainage and zone marking by site team.
  • —Days 3–7: command, sanitary and first P2 shelter deployed.
  • —Days 7–14: remaining P2/P1 shelter, clinic and stores completed.

Constraints & approach

  • —Incomplete infrastructure: WASH and minimum power interfaces were treated as first-order dependencies.
  • —Mixed dispatch: priority components went first for early occupancy while bulk shelter followed in batch 2.
  • —Temporary foundations: placement remained subject to bearing, drainage and wind checks.
  • —Clinical scope: equipment and medical gases were provided by the response agency.

Typical specifications for reference only. Final dimensions, materials and quantities per signed drawings and order.