Project overview

Rotational workforce camp for an oil & gas pipeline construction project procured by an international EPC. Requires worker/management zoning, HSE document coordination and phased occupancy aligned to welding milestones.

Client: International EPC (confidential). Duration ~30 months. Wall core: rockwool 75–100 mm.

Scope & scale

MetricValue
Beds~450
Delivery batches4
StoreysSingle-storey; 2–4 beds/room in management zone

Configuration summary

ModuleQuantitySystemNotes
M-DORM~360 worker bedsP14–6 beds/room
M-DORM~90 management bedsP12 beds/room
M-OFF180 m²P4Incl. induction room
M-CANT170 m²P1Cold kitchen zoning
M-SANGender-separated + 1 accessibleP1—
M-CLN60 m²P1—
M-GUA2P1—
M-STRGeneral storageP1Hazmat not in modular scope

Building systems & materials

  • —Primary P1 dormitory boxes; P4 welded boxes for management offices. Guard posts remain P1.
  • —Rockwool 75–100 mm; electrical 220 V / 50 Hz to interface.
  • —Modular buildings not ATEX-rated; explosion-proof equipment in dedicated rooms.

Site & phasing

Module location plan provided per batch with on-site numbering.

BatchMilestone alignment
1Management office + first 120 beds
2Main dorm ~200 beds
3Canteen + remaining dorm + clinic
4Sanitary, storage, guard posts

Schedule

Phased occupancy tracks pipeline welding spreads — management and first worker beds precede main dorm waves.

Constraints & approach

  • —HSE: material certificates and installation method statement for buyer submission.
  • —Explosion-proof: modular scope excludes ATEX; dedicated equipment buildings by buyer.
  • —Perimeter: dual guard posts; module IDs linked to gate registration SOP.

Typical specifications for reference only. Final dimensions, materials and quantities per signed drawings and order.

Discuss a similar camp configuration

Get Quote