Skip to content
UnitMod

PRJ-07 · Middle East

Middle East Private Villa Community

Gated villa community — 16 dwellings in two repeatable types, six of them with a P8 glass garden room. Component kits, three phased deliveries.

Middle East Private Villa Community

Project summaries illustrate typical export scope and configuration. Client names, exact locations, and figures may be rounded or withheld for confidentiality. Signed BOQ and contract govern actual supply.

Project overview

Private villa community developed in phases on a serviced plot outside the city. Sixteen dwellings in two repeatable types, plus six glass garden rooms on the larger plots. Scope covers superstructure, envelope, glazing and interior fit-out of the dwellings — excluding foundations, external works and landscape.

Buyer: private developer (confidential). Both unit types were fixed in the design brief before order; planning submission was handled by the buyer's local architect.

Scope & scale

MetricValue
Dwellings16 (2 types)
Unit areas~150 m² and ~210 m²
Storeys2 storeys, both types
Glass garden rooms6 × ~24 m², on the larger plots
Delivery batches3
On-site assemblyFirst dwelling habitable ~20 days; community completed per phasing over ~5 months

Configuration summary

ModuleQuantitySystemNotes
M-VIL-A10 × ~150 m²P7Type A, 2 storeys
M-VIL-B6 × ~210 m²P7Type B, 2 storeys
M-GRD6 × ~24 m²P8Gable sunroom, garden side
M-ANC1 gatehouse + 1 pump roomP1Ancillary structures

Building systems & materials

  • —Structure: cold-formed thin-wall steel, 1–2 storey system.
  • —Envelope: composite stud wall with external cladding to the approved elevation.
  • —Glazing: thermal-break aluminium with insulated tempered glass; laminated roof glass on the garden rooms.
  • —Electrical: 230 V / 50 Hz to the unit interface; mains connection by the buyer.

Site & phasing

No fixed unit figure is quoted for a villa — component volumes follow the signed drawings and the fit-out level. Component lists are issued per batch after the drawing freeze. Clearance and unloading at destination are buyer responsibility.

BatchContentOn-site window
12 show dwellings (type A + B) + gatehouseM3–M4
28 × type A, incl. 3 garden roomsM5–M7
36 × type B, incl. 3 garden rooms + pump roomM8–M10

Schedule

MilestoneTiming (from inquiry)
Unit types & fit-out level fixedM0–M1
Structural and shop drawings signedM1–M3
Batch 1 deliveryM3–M4
Show dwellings readyM4–M5
Final batchM10–M11

Constraints & approach

  • —Planning approval sat on the buyer's critical path, so drawings were issued early to let submission run in parallel with production.
  • —Desert climate: wall and roof build-up specified to the design temperature swing; shading designed into the orientation of each garden room.
  • —Skilled labour on site was limited, so the kit is labelled by panel number with a sequenced assembly guide.

Typical specifications for reference only. Final dimensions, materials and quantities per signed drawings and order.

Discuss a similar camp configuration

Get Quote